Sinopec Launches Ulanqab Green Hydrogen and Hydrogen Pipeline Project

According to China Petroleum & Chemical Corporation, published on 19 November 2026, the Ulanqab green hydrogen and hydrogen transmission pipeline project was officially announced at the Modern Hydrogen Industry Chain Co-operation Conference held in Beijing. Once completed, it will form the first cross-provincial large-scale long-distance pure hydrogen production, storage, transmission and consumption integrated project in the country.

3.png

The scheme is included in the national 15th Five-Year Plan for New Energy System Development and the 15th Five-Year Plan for Oil and Gas Development, and will be built in two phases. Phase one has a hydrogen production capacity of 100,000 tonnes per year, while phase two targets 200,000 tonnes per year. 

Phase one is matched with 2,450 megawatts of wind and solar power, alongside electrolyser capacity of approximately one gigawatt and an 805-kilometre hydrogen pipeline. 

The pipeline can carry 300,000 tonnes of hydrogen annually, rising to 500,000 tonnes each year after pressurisation works in phase two.

The pipeline starts from the Shangdu terminal station in Ulanqab, Inner Mongolia, and runs through 21 counties and districts across Inner Mongolia, Hebei, Tianjin and Beijing. Green hydrogen produced by the facility will be supplied directly to Yanshan Petrochemical and Tianjin Petrochemical to replace existing grey hydrogen output. 

Supply will also extend to natural gas hydrogen blending, hydrogen metallurgy, hydrogen transport and cross-border green hydrogen trade, covering the full industrial chain of hydrogen.